Locations |
Finland, Sweden, Germany, Norway, Ireland, Iceland, Denmark, Greenland, United States, Japan |
|
Cable length |
4,900 km (planned) Far North Fiber: 17,000 km Terrestrial Backbone Finland: 3,000 km C-Lion2: 1,300 km Polar Connect: 10,000 km |
|
Project start - end date (duration) |
1 January 2023 – 31 August 2024 (20 months) |
What will it provide?
The Northern EU Gateways project implements the first preparatory steps for a future connection between Europe, the USA, and Asia through the Arctic Ocean.
The study includes three core activities: a route planning a subsea cable in the Arctic area (Far North Fiber), a route planning for additional connectivity in the Baltic sea (C-Lion2), and a detailed route plan for a terrestrial backbone in Finland.
Implementations partially based on this study are Call 2 projects: Far North Fiber, providing marine ground surveys for the North Atlantic segment and building cable landing stations in Finland and Ireland, and North Pole Fibre, providing a fibre path between Kiruna in Sweden and the Norwegian Border.
How will it work?
The study will:
- Design physically secure and cyber secure digital backbone connections for Europe in order to minimise the risks for their deployment, use and maintenance;
- Design comprehensive digital networks in the Baltic Sea region and between the EU, North America and Asia;
- Survey the feasibility of submarine cable connections towards North America and Asia, including a connection between the Greenland and EU;
- Examine the feasibility of next generation sensing on submarine cables in the Arctic, in order to offer new tools in the study of climate change, seafloor seismicity and oceanography.
How is it financed?
The Northern EU Gateways study has a total budget of €7.3 million, of which €3.7 million funded under the Connecting Europe Facility (CEF) Digital programme.
Who is involved?
The Northern EU Gateways study is being undertaken by Cinia, as coordinator, with Nordunet as partner.
Last update
3 December 2024